One controlled package
Keep models, drawings, BOM and revision notes aligned so route decisions are made from the same requirement set.
RFQ entry
Share CAD files, drawings, quantity, material, finish, tolerance and documentation needs for engineering review before a manufacturing route is confirmed.
RFQ package
Clear inputs reduce avoidable quote loops. Unknown process or material choices are acceptable when the files and use context are clear.
Contact, likely process, quantity estimate, and free-text requirements. “Not sure” is fine on optional fields when the files will drive the route.
Material, finish, project type, timing, CAD and a revision-matched drawing. Upload files on the private project link after the RFQ is created.
Keep the stable reference. Engineering reviews the package—incomplete files often get focused questions first, then a reviewed quote or clear next step once the job is ready to review.
Keep models, drawings, BOM and revision notes aligned so route decisions are made from the same requirement set.
Separate acceptance requirements from alternatives that may reduce cost, timing or sourcing risk.
Destination, needed-by date and split shipments can change supplier and logistics choices.
Supplier fit, price, lead time, inspection and compliance remain project-specific until the reviewed quote states them.